5.2 Installation Location
Caution - Do not install the Machine near any vibration sources, for example air
compressors, punch press etc. Vibration sources will cause machining inaccuracies.
Caution - Do not expose the Machine and its NC controller to direct sunlight, moisture
or corrosion substances etc.
The Machine must be installed on a correctly prepared installation site. This will ensure the
Machine will operate efficiently and accurately.
The Machine should be installed in a damp, chemical, dust and shock free environment with
an ambient temperature of about 20 °C (68 °F).
5.2.1 Environmental Requirements
The environmental requirements for the Machine are:
• Voltage: 85% to 110% of rated voltage.
• Frequency: Rated frequency ± 2 Hz.
• Temperature: 0 °C to 45 °C (32 °F to 113 °F).
• Relative humidity - less than 90%.
• Do not install the Machine in a dusty or corrosive environment.
• Do not install the Machine in direct sunlight, near a heat source, or where there are large
environmental temperature changes.
• Do not install the Machine near any abnormal vibrations.
• Do not install the Machine near magnetic or static electricity fields.
• Do not install the Machine near air compressors or presses.
• Do not install the Machine near any equipment that produces electronic noise.
5.3 Foundation and Construction Plan
The Machine must be installed on a solid foundation to maintain machining accuracy during
long operations.
5.3.1 Foundation Construction
The foundation construction work must be completed at least 12 days prior to the installation
of the Machine. Refer to
Figure 38 for details.
1. Dig the site foundations to 1000 mm depth.
2. Pave the site bottom with a 200 mm layer of pebble stone.
3. Make sure 6 spaces are reserved for the installation of the L shaped fixing studs and
foundation pads before filling with concrete. Make sure the 6 surfaces are level and flat.
4. After the concrete has set and is dry and solid, put temporary foundation pads on the 6
reserved spaces. Position the Machine over the foundation pads. Make sure there is a
space of 50 mm between the machine base bed and the ground to install the L shape
fixing stud.