Installation Guide
Table Of Contents
- 页 1
- 书签C83E65F3 Aegean 18" Towel Bar
- 书签262AF3F0 Revised 05/05/21
- 书签5D3B9A84 Model No. : 182-6596 Polished Chrome 182-6597 Brushed Nickel 182-6598 Oil-Rubbed Bronze 182-7513 Matte Black
- 书签1047D021 10
- 书签8D926F27 Decorative Head
- 书签E07C96ED 10
- 书签E53558B8 9
- 书签84B00608 9
- 书签3BC105E0 7
- 书签AD89BE26 9
- 书签0E31D92A 9
- 书签0495047B 7
- 书签91B47874 7
- 书签F7509530 5
- 书签399A9E2A 5
- 书签F9D08ADA 7
- 书签008B4939 7
- 书签C69BC9E6 Use the stud finder to locate the studs. Determine which mounting step is best for the installation. Place the template \(#10\) on the wall in the desired location, verify it is level and tape it to the wall.
- 书签D505AC5E Mark the mounting screw holes through the template \(#10\) with the pencil, then remove the template \(#10\).
- 书签EB510A9C Step 4 Drywall or Ceramic Tile Installation: Drill 1/4" holes in the wall where marked, then push the insert anchors \(#8\) into the holes, using the hammer to gently tap them into place.
- 书签1CD585FA Wood Wall Stud Installation: Drill 1/16" holes in the wall where marked, keeping the drill level. Insert anchors \(#8\) will NOT be used.
- 书签8292D0A3 Dry Wall Installation: Hold the mounting bracket \(#7\) over the mounting holes and tighten the mounting screws \(#9\) into the insert anchors \(#8\). See Figure 1 for an example. Wood Wall Stud Installation: Hold the mounting bracket \(#7\) over the mounting holes and tighten the mounting screws \(#9\) directly into the pre-drilled holes. See Figure 2 for an example.
- 书签EB599689 Assemble the towel bar as shown in Figure A. Position the bases \(#3 and #5\) of the assembled towel bar over the mounting brackets \(#7\) with the set screw sockets facing down. Tighten the set screws \(#1\), using the provided Allen wrench \(#6\) as shown in Figure B.
- 书签722291D5 6
- 书签F64B24CD 6
- 页 2