Clock-User Manual-2020

3 | Clock Multi Manual
Contents Page
Data tables 3
Pre installation 4
Ventilation 5
Flue requirements 5
Installation 5
Hearth distances 5
CO alarms 5
Clean air act 5
Commissioning 6
Curing process 6
First light 6
Important information for wood burning 7
Important information for solid fuel 7
Cleaning 8
Warranty 8
Tips 8
Dimensions 9
Defra settings 10
Controls 11
Controls 12
Materials used in construction 12
Contact numbers 12
Welcome to your stove
All our stoves are hand made in the uk from the start to nish a claim only few can make.
Please note it is a legal requirement under England wales and European building regulations that the
installation of the stove carried out under local authority building control approval or installed by a
competent person registered with a government approved scheme.
This appliance does get hot whilst running. It is recommended that a suitable guard is used to protect
children and the elderly or inrm
You can nd videos of
how to use the stoves and
change parts on the Clock
Woodburners You Tube page
Clock Woodburners are CE approved,
Defra exempt and can be used in smoke
controlled zones only when stop is in
place and installed in accordance with
the current building control regulations
At Clock Woodburners we undertake
and strive for advancement in our
products.
Do not make unauthorised
modications to appliance
WARNING: the stove surfaces can
reach extremely high temperatures
take care