Instruction manual
Linddana A/S, Ølholm Bygade 70, DK-7160 Tørring, Telephone +45 75 80 52 00 Fax +45 75 80 54 11
Instructions: TP 150-200-250 dated 05.12.2005
Copyright 2001
26
SPECIAL INSTRUCTIONS FOR TP 250 DHM
TP 250 DHM is a trailer-mounted, motor-driven slab cutter. The unit can be registered for inspection-free
coupling and can be attached to any vehicle with a ball tow bar. The ball coupling head on the draw bar
can be replaced by a shackle and pin set as an optional extra.
Coupling height is adjustable from 380mm to 900mm.
B = 42-50 kg (M = 250-300 Nm) Remember to use
a split pin
After adjusting the draw bar, lock into position by tightening the screw connector to the above torque.
Remember to secure the screw connector with a split pin!
Transport on public roads
When towing on public roads, the exhaust chute
should face backwards and be locked to prevent
rotation. See Fejl! Henvisningskilde ikke fundet.
page Fejl! Bogmærke er ikke defineret.
When towing, ensure the lock on the rotation collar
is engaged to prevent rotation and is secured with a
split pin.
Pos A = Transport
Pos B = Working position
The folding funnel must also be folded down and
secured with a split pin.
Connect the 7-pin plug and safety wire to the vehicle coupling the trailer to a vehicle.
Raise the jockey wheel.
Disengage the handbrake before moving off.
Check lights and brakes before moving off.
Trailer dimensions: Width 2200 mm. Length 4600 mm. Height 3200mm
Tyres: 165R13C/8
Tyre pressure (cold), max: 450 kPa = 65 psi. = 4.5 bar
To avoid damaging the electrical system, comply with the following:
1. Never leave ignition key in Neutral when machine is running.
2. Keep frame connections clean.
3. Disconnect frame cable for battery charging.










