User`s guide
© Copyright 2003 Clipsal Integrated Systems Pty Ltd. Page 16
Intelligent Building Series C-Touch User’s Guide
Intelligent Building Series C-Touch User’s Guide
© Copyright 2003 Clipsal Integrated Systems Pty Ltd. Page 17
The loads can be adjusted at will by clicking on the sliders and once they are set
to the required levels then pressing BACK at the top right will return to the Scene
Programming page.
8.2 Schedule Editing
The schedule editing feature is accessed by means of the Schedules button on
the Diagnostics page as shown in section 17.3.1 below. When the Schedules
button is pressed a list of available schedules is displayed as shown below:
Choosing any schedule from this list displays the “Edit Schedule” page
For each “pulse” type schedule, ve different aspects can be adjusted; the day of
the week, the month, the duration of the pulse, the day of the month and the time
of schedule activation.
For “ramp” or “scene” type schedules, the Duration is not available. Selecting the
“Day of the Week” button displays a page as shown on the next page. Any day or
combination of days may be selected by pressing in the “check box” area.