Specifications
Intelligent Building Series C-Touch Programming Reference
Scheduling Pro-Forma
AM PM Name/Load or Scene/Enabled By
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00
Enter the name of the load in the Load column and draw a black line with a felt marker to block out the times that loads are to start and
stop.
© Copyright 2002 Clipsal Integrated Systems Pty Ltd Page 76