Specifications

Intelligent Building Series C-Touch Programming Reference
Note that in all these layouts there are three possible locations for navigation
buttons, the last one being lower right. This is typically to be used to return
control to an intermediate level page such as the Images and Controls page. As
a rule a project should not contain more than three “levels” of pages. By
providing only three positions for return buttons this rule is enforced by the page
layout.
Regardless of which page the user is looking at, the buttons have the same
meaning: Lower Right returns to the next page up, Lower Middle refers to the
one above that and Lower Left returns to the topmost page. This rule is not
enforced in any way (as perusal of the sample projects attest) but represents
good design practice.
The last page illustrated here is the Schedules and Scenes page. The buttons
on this page act to control schedules and scenes, which are described in the
next section. The “Disarm Schedules” button sets a Group Address in the
Control Application and all schedules (except KitchenWeekdayDinnerON &
KitchenWeekdayDinnerOFF) are triggered by this Group Address. This button
provides a convenient way to arm or disarm schedules throughout the project.
The buttons which are linked to scenes use the “Key Function” option for the
buttons. (This function is accessed by double clicking the button, the C-Bus tab
and the Key Function sub-tab and choosing the scene button).
In an actual project several pages could be required to describe the whole
project. The layout chosen here supports up to four buttons per page and if the
restriction on three levels of hierarchy is observed the total number of pages in
such a project would be theoretically 21 pages. If a layout with eight buttons per
page were used, the project could have 73 pages. Given the memory limits of
the C-Touch unit it is unlikely that a project that size with typical graphics and
fonts would be downloadable. The “three deep” rule is thus not a great
restriction.
Once the overall storyboard is sketched out, the schedules and scenes need to
be designed.
© Copyright 2002 Clipsal Integrated Systems Pty Ltd Page 61