10.6.5 Initial Implementation
Once the overall requirements have been recorded, the project should be
designed at the office and brought back when complete.
10.6.6 Simulation
The simulation mode can be used to demonstrate how the project will look
when installed. In the case of an existing C-Bus system where the C-
Touch unit is being added as a retrofit, the computer may be connected
via the PC Interface to the C-Bus network and the simulation mode used
to actually run the various scenes and schedules on the network.
10.6.7 Iteration
Having the simulation available allows the quick modification of the project
in response to user feedback on the spot and the refinement of the project
may take place on site. The customer should be encouraged to explore
two or three options during this step to engender “ownership” of the design
and help guarantee a satisfied customer.
10.6.8 Download and Commissioning
When a C-Touch unit is programmed the quickest and most reliable
method of downloading a project is via the serial connection. A project that
takes 5 minutes to download using a serial connection could take 45
minutes to download over the C-Bus network.
In the case of a new installation, the C-Touch unit is installed along with
the rest of the C-Bus equipment and commissioning of C-Touch is carried
out as part of the overall commissioning work.
If the C-Touch unit is being used to retrofit an existing C-Bus network, the
unit need only be physically installed and connected onto the network. In
this case the scenes and schedules can be tested along with any other
functionality designed into the project.
Tip: The clock in C-Touch can be reset to different dates
and times to test the schedules in the project.