Specifications
Intelligent Building Series C-Touch Programming Reference
Note that the Schedules displayed will not be executed unless the
Scheduler is running and the schedules are enabled. It can also be set
running by clicking on the Edit | Schedule | Run Scheduler item in the
menu. (The last two illustrated, KitchenDinnerWeekWinterON and OFF are
disabled because the date of 30/10/2001 does not fall within the winter
months in the Southern Hemisphere where this schedule was designed).
© Copyright 2002 Clipsal Integrated Systems Pty Ltd Page 41