Specifications
Intelligent Building Series C-Touch Programming Reference
Day
The day(s) that the Schedule is to occur is set on the Day tab. By default,
the Schedule is set to occur every day.
There are two ways of selecting the day. More or less detail can be
displayed by clicking on the more or less button.
The option with less detail allows the days to be selected as follows:
• Once Only –the date will need to be entered, or selected from the
drop-down calendar
• Every Day
• Every Day of the working Week (Monday to Friday)
• Every Day of the Weekend (Saturday and Sunday)
• Every Week – the desired day will need to selected
• Every Month – the day of the month will need to selected
The page with more detail (click on the more button)
p
provides a more complete day selection:
• If the Schedule is to occur on particular days of the week, the
required days must be selected. There are buttons at the bottom to
allow:
• all days to be set quickly
• all days to be cleared quickly
• week days or weekends to be set
© Copyright 2002 Clipsal Integrated Systems Pty Ltd Page 39