Specifications
© Copyright 2003 Clipsal Integrated Systems Pty Ltd. Page 8
Intelligent Building Series C-Touch Installation Instructions
© Copyright 2003 Clipsal Integrated Systems Pty Ltd. Page 9
Intelligent Building Series C-Touch Installation Instructions
2. The next step is to push the top end of the
wall bracket through the hole in the wall.
The steps in the installation are described in the ve gures which follow.
1. Prepare the wall by marking with the
supplied template. Carefully cut out the
hole indicated on the template. The hole
must not deviate beyond the range of +
3mm and – 0mm to ensure a good t.
Loosely assemble the C-Touch unit by
inserting the two long screws through
the side holes and threading them
through the wall box. Burr the ends of
the screws over so that they cannot be
easily removed at a later date.