Getting Started Guide

The Control Panel should display if the Power Switch is within the operation range (please refer
to the operation manual of the Control Panel).
Supervision
After the Power Switch is successfully learned in to the Control Panel, the device will automatically
transmit supervisory signal along with ON/Off status to the Control Panel at random intervals of 15 to 18
minutes.
If the Control Panel has not received the signal from the Power Switch for the preset period of time, the
Control Panel will indicate on its display that the particular Power Switch is experiencing an out-of-signal
problem.
Operation
Installation
Plug the Power Switch into a power outlet, then plug the appliance into the socket of the Power Switch.
The appliance must be in ON status.
Appliance Control
After the Power Switch is successfully learned in to the Control Panel, the Control Panel can remotely
turn on/off the Power Switch to control the appliance. Please refer to your Control Panel manual for
details.
You can also press the button on the Power Switch to toggle its on/off status
If the Power Switch is removed from power outlet, after re-plugging the Power Switch, its previous on/off
status will be transmitted to the Control Panel.
Maximum Operation Load
For 110V: the maximum operation load is 1760W and 16A.
For 230V: the maximum operation load is 3680W and 16A.
If the Power Switch is overheating, it will cut off power automatically as a safety measure. The LED
indicator will flash quickly. The Power Switch must be unplugged and re-plugged after cut off to resume
normal operation.
Factory Reset
Factory resetting the Power Switch will clear its memory and restore it to factory default settings.
Press and hold the test button while powering on the Power Switch, then release the button when the
LED lights up to factory reset.
2