Unit installation
35
climatemaster.com
THE SMART SOLUTION FOR ENERGY EFFICIENCY
Tranquility
®
22 (TY) Series
Rev.: 12/17/14
Conventional
T-stat signal
(Non-Communicating)
Unit
ECM fan
G Fan only
G, Y1 Stage 1 heating
1
G, Y1, Y2 Stage 2 heating
1
G, Y1, Y2, W Stage 3 heating
1
G, W Emergency heat
G, Y1, O Stage 1 cooling
2
G, Y1, Y2, O Stage 2 cooling
2
1
Stage 1 = 1st stage compressor, 1st stage fan operation
Stage 2 = 2nd stage compressor, 2nd stage fan operation
Stage 3 = 2nd stage compressor, auxiliary electric heat, 3rd stage fan operation
2
Stage 1 = 1st stage compressor, 1st stage fan operation, reversing valve
Stage 2 = 2nd stage compressor, 2nd stage fan operation, reversing valve
DXM2 Controls
Figure 26b: Test Mode Button
Table 7c: Unit Operation
DXM2 Control Start-up Operation – The control will not
operate until all inputs and safety controls are checked
for normal conditions. The compressor will have a 5
minute anti-short cycle delay at power-up. The fi rst time
after power-up that there is a call for compressor, the
compressor will follow a 5 to 80 second random start delay.
After the random start delay and anti-short cycle delay,
the compressor relay will be energized. On all subsequent
compressor calls, the random start delay is omitted.
(240Vac)
Com
N.O.
Fan Enable
Test
P5
B-
Gnd
P4
A+ 24V
(240Vac)
Fan Speed
N.O.
N.C.
12V
OUT
Gnd
P8
IN
NC
P12
Pust test button to enter Test
Mode and speed-up timing and
delays for 20 minutes.