TS Series 60Hz - HFC-410A Submittal Data Eng/I-P
Page ______ of ______
General:
Furnish and install ClimateMaster Tranquility
®
“TS” Water Source Heat Pumps, as indicated on the plans. Equipment shall be
completely assembled, piped and internally wired. Capacities and characteristics as listed in the schedule and the specications that
follow.
Units shall be supplied completely factory built capable of operating over an entering water temperature range from 20° to 120°F
(-6.7° to 48.9°C) as standard. Equivalent units from other manufacturers may be proposed provided approval to bid is given 10 days
prior to bid closing. All equipment listed in this section must be rated and certied in accordance with Air-Conditioning, Heating and
Refrigeration Institute/International Standards Organization (AHRI/ISO 13256-1). All equipment must be tested, investigated, and
determined to comply with the requirements of the standards for Heating and Cooling Equipment UL-1995 for the United States and
CAN/CSA-C22.2 NO.236 for Canada, by Intertek Testing Laboratories (ETL). The units shall have AHRI/ISO and ETL-US-C labels.
All units shall be fully quality tested by factory run testing under normal operating conditions as described herein. Quality control
system shall automatically perform via computer: triple leak check, pressure tests, evacuation and accurately charge system, perform
detailed heating and cooling mode tests, and quality cross check all operational and test conditions to pass/fail criteria. Detailed
report card will ship with each unit displaying status for critical tests and components. Note: If unit fails on any cross check, it shall
not be allowed to ship. Serial numbers will be recorded by factory and furnished to contractor on report card for ease of unit
warranty status. Units tested without water ow are not acceptable.
Basic Construction:
Horizontal Units shall have one of the following air ow arrangements: Left Inlet/Straight (Right) Discharge; Right Inlet/Straight (Left)
Discharge; Left Inlet/Back Discharge; or Right Inlet/Back Discharge as shown on the plans. Units must have the ability to be eld
convertible from straight to back or back to straight discharge with no additional parts or unit structure modication. Horizontal units
will have factory installed hanger brackets with rubber isolation grommets packaged separately.
Vertical Units shall have one of the following air ow arrangements: Left Return/Top Discharge, Right Return/Top Discharge, Left
Return/Bottom Discharge, Right Return/Bottom Discharge as shown on the plans.
If units with these arrangements are not used, the contractor is responsible for any extra costs incurred by other trades. All units
(horizontal and vertical) must have a minimum of three access panels for serviceability of compressor compartment. Units having
only one access panel to compressor/heat exchangers/expansion device/refrigerant piping shall not be acceptable.
Compressor section interior surfaces shall be lined with 1/2 inch (12.7mm) thick, 1-1/2 lb/ft3 (24 kg/m3) acoustic type glass ber
insulation. Air handling section interior surfaces shall be lined with 1/2 in (12.7mm) thick, 1-1/2 lb/ft3 (24 kg/m3) foil faced ber
insulation for ease of cleaning. Insulation placement shall be designed in a manner that will eliminate any exposed edges to prevent
the introduction of glass bers into the air stream. Units without foil faced insulation in the air handling section will not be
accepted.
The heat pumps shall be fabricated from heavy gauge galvanized steel with powder coat paint nish. Both sides of the steel shall be
painted for added protection.
Standard cabinet panel insulation must meet NFPA 90A requirements, air erosion and mold growth limits of UL-181, stringent fungal
resistance test per ASTM-C1071 and ASTM G21, and shall meet zero level bacteria growth per ASTM G22. Unit insulation must
meet these stringent requirements or unit(s) will not be accepted.
All horizontal units to have factory installed 1” (25.4mm) discharge air duct collars, 1” (25.4mm) lter rails with 1” (25.4mm) lters
factory installed, and factory installed unit-mounting brackets. Vertical units to have eld installed discharge air duct collar, shipped
loose and 1” (25.4mm) lter rails with 1” (25.4mm) lters factory installed. If units with these factory-installed provisions are not
used, the contractor is responsible for any extra costs to eld install these provisions, and/or the extra costs for his sub-
contractor to install these provisions.
All units must have an insulated panel separating the fan compartment from the compressor compartment. Units with the
compressor in the air stream are not acceptable. Units shall have a factory installed 1 inch (25.4mm) wide lter bracket for lter
removal from either side. Units shall have a 1 inch (25.4mm) thick throwaway type glass ber lter. The contractor shall purchase one
spare set of lters and replace factory shipped lters on completion of start-up. Filters shall be standard sizes. If units utilize non-
standard lter sizes then the contractor shall provide 12 spare lters for each unit.
Tranquility
®
20 (TS) Series 60Hz
Engineering Specications – Page 1