Specifications

41
The Smart Choice for Energy Efficiency
Th
he Smart Choice for Energ
Riser Arrangements - Bottom Floor Units
1. All Riser Through Slab At Bottom
• Bottom supply & return
• Top supply & return feeding other equipment below
2. Supply & Return Capped At Cabinet Run-Out, Drain Through Slab
• Top supply & return
• Supply & return mains above these units on "Between-Floors" main piping
3. All Risers Capped At Cabinet Run-Out, Drain Through Slab
• Isolated unit top supply & return from adjacent riser with separate drain
• Check riser venting
4. Supply Or Return Capped At Cabinet Run-Out, Other Risers Extend Through Slab
• Bottom supply, top return piping
• Bottom return, top supply piping
Note: Check system ushing and air venting speci cations.
Standard for bottom supply & return
unless otherwise speci ed.
Standard for top supply & return un-
less otherwise speci ed.