Service manual

THE SMART SOLUTION FOR ENERGY EFFICIENCY
Vertical Stack
Rev.: 11/09/12
11
climatemaster.com
Cabinet Installation
Table 1: Supply Grille Sizes and Arrangements
Figure 2: Cabinet
Supply Grille Installation -
Cabinet opening should be
sealed to wall. Use canvas-type fl ex collar or fi eld supplied
duct extension if needed.
Refer to Table 1 to make sure that the grille size is correct
based on the type and size of the supply air grille.
Install the grille into the cabinet discharge opening.
Assure that the grille flange rests against the drywall
covering the cabinet. Do not caulk.
Secure the grille to the drywall with the screws
provided.
Unit Size Single Discharge Double Discharge Triple Discharge
TRM09 12” x 10” 10” x 6” N/A
TRM12 12” x 12” 10” x 6” N/A
TRM15 16” x 12” 14” x 8” 14” x 6”
TRM18 16” x 12” 14” x 8” 14” x 6”
TRM24 N/A 16” x 10” 16” x 6”
TRM30 N/A 16” x 12” 12” x 10”
TRM36 N/A 16” x 14” 16” x 10”
Sight and
Sound Baffle
Condensate Hose
(
7/8” I.D.)
Internally trapped
Control Box
Conduit For
Electrical
SIDE VIEW
Wallboard
Flanges Field
Fabricate
Extensions
If Required
Shipping
Brace
Riser Clamp -
Top and Bottom
Riser runouts must be
centered in slot. They may have
moved durring shipping.
Loosen clamps and readjust
if needed. Then re-tighten clamps.
Riser
Shutoffs
Riser
Runout
3” Swage
Do not remove
until framing
and wall board
is complete