Manual

www.climacoolcorp.com
2
Inspection
Upon receipt of equipment, carefully check the shipment
against the bill of lading and inspect each chiller for any
damage incurred during shipment. Thoroughly check for
any visible damage of control panels and electrical
and/or refrigeration components or broken copper lines.
The carrier must make proper notation of any damages or
shortages on all copies of the bill of lading and complete
acceptance of the shipment. Note: It is the responsibility
of the purchaser to le all necessary claims with the
carrier. In addition, please notify the ClimaCool Customer
Service Department at 405.815.3000 or customerservice@
climacoolcorp.com of all damage immediately.
Storage
Chillers should be stored in an upright position and kept in a
clean, dry area.
Handling of Modules
Carefully remove the module’s packaging. The chiller’s
steel base cutouts provide maneuverability by forklift or
Procedures on page 7). Verify that all header grooved
couplings and mounting hardware kits are on site prior to
connecting the modules. Note: Consult factory for handling
other than in the upright position.
Rigging and Lifting
Each module should be lifted using a pallet jack or fork
lift. If it is necessary to utilize a crane for rigging or lifting,
each module shall be lifted using lifting straps and spreader
Procedures on page 7.
Warranty
To ensure proper equipment longevity, design performance
and reliability, all ClimaCool chillers must be installed,
operated and maintained in accordance with ClimaCool
IO&M manuals. Water quality is of the utmost importance
for the proper care and maintenance of your modular
chiller system. Regular treatment of the water will increase
longevity of your system. Failure to provide adequate
ltration or treatment of evaporator and condenser
water will void the ClimaCool module’s warranty. A
factory authorized technician is required to perform
the startup of your ClimaCool chiller. Please contact the
ClimaCool Customer Service Department at 405-815-3000 or
technicalsupport@climacoolcorp.com to schedule. There is
a minimum of three (3) weeks’ notice required to schedule
your factory startup.
Pre-Installation