PreStartUp R-410A WaterCool 11.02.12
Project Name: _________________________________________________Date:___________________
Address: _____________________________________________________________________________
YES
NO
1. Are modules connected properly per Codes and Installation Manual? ___ ___
(Installation, Operation & Maintenance Manual is available at www.climacoolcorp.com
)
2. Is there a minimum of 60 mesh strainer on condenser and evaporator inlet water? ___ ___
(Fill water to chiller being sure to pass through a minimum of 60 mesh strainer.)
3. Is condenser water system filled and flushed
? (See “Filling the Water System” in ClimaCool IO&M.) ___ ___
4. Is chilled water system filled, flushed and all air purged from system? ___ ___
(Air must be purged from system prior to startup. See “Filling the Water System” in ClimaCool IO&M.)
5. Are all pumps tested and operational? ___ ___
6. Are required GPM’s (verified by pressure differential) supplied to the chilled water side? ___ ___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
7. Are required GPM’s/Pressure differential being supplied to the condenser? ___ ___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
8. Pressure differential flow sensors or switches set to trip on the drop below required flows? ___ ___
(Set to trip on low flow (less than 75% flow), not pump on/off
.)
9. Have all chiller coupling connections been leak tested? ___ ___
10. Is water presently circulating through chiller? ___ ___
11. Verified that temperature sensors and voltage/phase monitor have been installed? ___ ___
12. Verified power supply agrees with chiller nameplate? ___ ___
13. Is power and communication wiring complete to each module? ___ ___
14. Verify that wiring and devices meet with approved electrical submittal drawings? ___ ___
15. Is required load available to run multiple compressors at startup? ___ ___
16. Is control functional to maintain condenser water temperature? ___ ___
(Includes maintaining “minimum” inlet temperature; see “Operational Limitations” in ClimaCool IO&M.)
17. Is a water header bypass installed at the chiller? _________ ClimaCool provided? _________Field provided? (Check one)
If you checked “No” to any question above, provide the line reference number and the date of scheduled completion below.
Please note all conditions must be complete prior to the startup date.
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
*This form must be completed and submitted to ClimaCool Corp. a minimum of three (3) weeks prior to final scheduling of any
startup. Note: If any of the above items are not complete at time of startup, back charges will be assessed for additional costs.
Contractor Name: ___________________________
Address: ___________________________ _______________________________________________
___________________________ (Authorized Signature)
Phone: ___________________________ Date: _________________________________________
Pre Startup Check List (Water-Cooled)
E-mail customerservice@climacoolcorp.com Fax 405-815-3052