Manual
55
www.climacoolcorp.com
®
Head Pressure Control Valve Operation ORI/ORD
EXAMPLE: Our example calls for a compressor equipped with
unloaders Since the compressor would unload at the low ambients
this must be taken into consideration This is necessary since as the
compressor unloads, the condenser’s capacity increases and additional
ooding is required Using the same roof-top unit as in the earlier
example (40°F evaporator and minus 20°F minimum ambient), a
multiplier of 79 is shown in Table-2 And since we have unloaders
(50%), this 79 is used to enter Table-3 to nd a multiplier of 91 This
nal multiplier is applied to the 119 pounds calculated earlier to arrive
at the nal extra charge requirement: 119 x 91 = 108 pounds This is
added to the normal system charge to arrive at a total system charge
Table 1
Table 2
Percent of Condenser to be
Flooded
High Suction Temp.
A/C Chillers
Evaporating Temperature
o
F
Condenser
Ambient
Temperature
o
F
35 40 45 50
80 0 0 0 0
70 0 0 0 0
60 26 20 10 4
50 45 40 33 28
40 56 52 46 42
30 64 60 55 51
20 69 66 62 59
0 76 73 70 68
-20 80 79 76 73
Table 3
Condenser Flooding
with NO Unloading
Percent of Full
Compressor
Capacity
= 50%
05 50
35 01
75 51
06 02
36 52
66 03
96 53
27 04
47 54
67 05
97 55
18 06
38 56
68 07
88 57
19 97 *
29 08
69 58