Manual
2
www.climacoolcorp.com
®
Inspection
INSPECTION
Allow a sufcient amount of time to carefully follow these
instructions to assure warranty coverage
During inspection of the equipment remove the top doors to
check the equipment for any damage during shipment Inspect
wiring connections, lines from expansion devices, thermostats,
and pressure switches for damage
General
During any correspondence concerning this machine, always
reference the full model and serial numbers of your modules
Receipt of the ClimaCool Modules
Upon receipt of the equipment, carefully check the shipment
against the bill of lading Make sure all modules ordered have
been received Inspect the carton or crating of each module and
inspect each module for damage You must make proper notation
of any shortages or damage on all copies of the freight bill
for your records. Make sure the carrier completes a common
carrier inspection report listing any shortages or damage.
Concealed Damage
Concealed damage not discovered during unloading must
be reported to the carrier within fteen (15) days of receipt
of shipment If not led within fteen (15) days, the freight
company can deny the claim without recourse. Note: It is the
responsibility of the recipient of the modules to le all necessary
claims with the carrier In addition, please notify the ClimaCool
Customer Service Department of all damage within fteen (15)
days of receipt Refer to the back cover for the Customer Service
Department phone number
Storage
Equipment should he stored as shipped in a clean, dry
area Store modules in an upright position at all limes
Plastic wrap should be left on until the module is
ready to he installed
Handling of Modules
The packaging allows for handling by fork lift or pallet jack
(only lift the module from the side) See Lifting and Transporting
Modules (Fig 3) on page 5 Caution: modules are top heavy
Please use caution when rigging or moving
Rigging for Lifting
Each module should he lifted by using lift straps threaded
through each top header tube See page 6 - Rigging and Lifting
Procedures
Preparing for Installation
Prepare the modules for installation by carefully removing the
module’s packaging, unbolt the module from the skid, and lift the
module with a crane or hoist into its nal position Hardware kits
are shipped in separate packaging along with the modules Make
sure the hardware kits are on site when connecting the modules