Manual

2
www.climacoolcorp.com
®
Inspection
INSPECTION
Allow a sufcient amount of time to carefully follow these
instructions to assure warranty coverage
During inspection of the equipment remove the top doors to
check the equipment for any damage during shipment Inspect
wiring connections, lines from expansion devices, thermostats,
and pressure switches for damage
General
During any correspondence concerning this machine, always
reference the full model and serial numbers of your modules
Receipt of the ClimaCool Modules
Upon receipt of the equipment, carefully check the shipment
against the bill of lading Make sure all modules ordered have
been received Inspect the carton or crating of each module and
inspect each module for damage You must make proper notation
of any shortages or damage on all copies of the freight bill
for your records. Make sure the carrier completes a common
carrier inspection report listing any shortages or damage.
Concealed Damage
Concealed damage not discovered during unloading must
be reported to the carrier within fteen (15) days of receipt
of shipment If not led within fteen (15) days, the freight
company can deny the claim without recourse. Note: It is the
responsibility of the recipient of the modules to le all necessary
claims with the carrier In addition, please notify the ClimaCool
Customer Service Department of all damage within fteen (15)
days of receipt Refer to the back cover for the Customer Service
Department phone number
Storage
Equipment should he stored as shipped in a clean, dry
area Store modules in an upright position at all limes
Plastic wrap should be left on until the module is
ready to he installed
Handling of Modules
The packaging allows for handling by fork lift or pallet jack
(only lift the module from the side) See Lifting and Transporting
Modules (Fig 3) on page 5 Caution: modules are top heavy
Please use caution when rigging or moving
Rigging for Lifting
Each module should he lifted by using lift straps threaded
through each top header tube See page 6 - Rigging and Lifting
Procedures
Preparing for Installation
Prepare the modules for installation by carefully removing the
module’s packaging, unbolt the module from the skid, and lift the
module with a crane or hoist into its nal position Hardware kits
are shipped in separate packaging along with the modules Make
sure the hardware kits are on site when connecting the modules