ASSEMBLY INSTRUCTION 10 x 10 ft Louvered Pergola
NO. COMPONENT QTY A 1 1 A1 A2 1 A3 1 B 2 C 1 C1 1 D 26 E 1 F 4 G 4 C C1 NO.
1 A/A1/A2/A3 A/A1/A2/A3 2 2 Step 1: A/A1 foot pipe installation F and G First, F set into the A/A1 before installing the G footplate Use 2# bolts and spacers to fix them.
3 B 1 3 B A/A2 B A3/A1 A/A2 Step 3: Place tube B in the dotted line position After inserting the B tube into the A and A3 foot tubes, secure them with bolts.Then repeat the same steps for A1 and A2. Note that A and A1 must be on the same side , A2 and A3 must be on the same side after the installation is completed 4 B A B A3 A1 A2 Step 4: Repeat step 3 the figure below shows.
4 1 1 B C A A3 C1 Step 5: Insert the C/C1 tube into the A/A1 leg in accordance with figure below shows. and then bolt it into the A/A1 leg. Fixing 6 Step 6: Install step 5 and step 3 together.
7 Step 7: Install the aluminum top plate, first the aluminum plate a head into the plastic parts, the other end will first have a gap place into the plastic parts, then use your hand to force the top plate, stuck into the plastic parts can be, and then Then repeat the operation for the remaining top plate. See the illustration on the right.