Metal Garden Shen 3‘x5’FT 2-3 Recommended to wear gloves to avoid scratches
3x5 Metal Garden Shen PLAN AHEAD Before beginning installation, check local building codes reg arding footings, location and other requirements. Study and understand this instruction. Important information and helpful tips will make your installation easier and more enjoyable. Tools and Materials: There are some basic tools and materi als you will need for the installation.
GC M3 M3 GC M4 P1 P2 P3 P1 GC M4 M3 M3 GC S4 S3 S2 L3 L2 UP1 L1 W2A W1A W1A W1A W2A W2A W1A 20 DX1 DH W2A DR1 DL1 W1A W3A URA DF DF ULA DX1 DH 20 B2 BR BL 2 B1
S2 1 B2 S4 1 BL S3 1 BR P1 2 L1 P2 1 L2 P3 1 L3 GC 4 UP1 F1 162 B1 1 M3 4 F2 10 M4 2 F3 16 W1A 5 V2 150 W2A 4 S1 150 DF 1 DX1 2 DH 2 DG 1 W3A ULA URA 20 2 DL1 1 DR1 1 3
F1 B2 B1 1 B2 1 BL 1 F1 4 V2 4 V2 BL B2 BL B2 BL B1 BL BL F1 V2 B1 B1 F1 B2 BR F1 B2 BR 4 BR 4 BR B2 B1 BL F1 BR BR B1 4 B1
W2A W2A F1 4 V2 4 B1 B2 W2A V2 F1 W2A F1 4 V2 4 W2A F1 V2 W2A B1 B2 5
W2A 2 F1 8 V2 8 W2A W2A V2 B1 F1 L3 1 F1 6 V2 6 B2 V2 F1 L3 6
F1 L1 1 L2 F1 1 6 V2 6 V2 L2 L1 B1 B2 W1A 2 F1 16 V2 16 W1A W1A V2 7 F1
W1A 2 F1 16 V2 16 W1A W1A V2 F1 W1A 1 F1 4 V2 4 W1A V2 8 F1
UP1 1 F1 5 V2 5 UP1 V2 F1 W3A 1 F1 4 V2 4 W3A 9 V2 F1
URA 1 ULA 1 F1 8 V2 8 F1 URA V2 ULA internal setup F1 ULA URA URA ULA F1 S2 1 F1 8 8 V2 V2 S2 10 V2
S3 1 S4 1 8 V2 10 F2 F1 V2 2 S3 S4 S3 S4 S3 F2 S4 F2 V2 P1 2 P2 1 P3 F1 1 32 V2 32 F1 V2 P1 P3 P1 P1 P1 Pls pay attention to assembling way of roof panels! P2 11
F1 F1 M3 V2 x2 V2 M3 GC M4 x4 M3 F1 V2 GC M3 M4 M3 M4 GC GC M3 M3 M3 M4 GC M3 M3 M4 M3 M3 4 M4 8 V2 8 20 DR1 DL1 DX1 DG DX1 20 12
DX1 2 20 2 DL1 1 DR1 1 DG 1 F1 14 20 20 F2 DX1 F2 6 DR1 DL1 F1 DX1 20 20 F1 DH 2 F3 8 DH F3 DH 13 X2
F3 X2 DF F1 S1 122 S1 V2 14 F1 DF 1 F3 8 F1 2
15