E. CHECKOUT and STARTUP
The Checkout and Startup procedure prepares a recently installed or repaired COMBI for
operation. The procedures check proper electrical, gas, water, and drain connections to the
COMBI, and verify basic COMBI operation.
Table 2-5 Installation Check List
TASK REFERENCE COMPLETED
Page No.
Preparation
Check operating location clearances 9
Test supply water quality 11
Verify Electric Power Requirements. 10
Verify Gas Supply Requirements 16
Verify Exhaust Hood Requirements 18
Installation
Check Exhaust Hood 18
Check electrical line connection 10
Check water supply connection 11
Leak Test water supply lines 11
Check Gas Supply Connection 16
Leak Test Gas Supply Connection 16
Verify Combi is level 20
Check drain line connection 14
Perform Burner Ignition Test 23
Perform Startup Test 23
Notes: