2.
Build the Support Box structure to appropriate height. If working with a concrete sub-floor,
thoroughly inspect and clean the floor in the tub cut out channel prior to securing the treated
2x4. Remove any materials from the concrete that may cause an uneven surface. Apply
adhesive directly to the concrete floor. Insert the 2x4’s and thoroughly spread the adhesive on
the concrete.
If wood sub-floor is present, screw the 2x4 directly to the sub-floor, or you can use the adhesive to adhere
it in place.
3.
Prior to inserting the small Support Box, it is first necessary to secure a 22 ½” long 2x4 into the
channel of the small Support Box. Place a bead of adhesive around the inside of the Support Box and
insert the 2x4. Place several screws into the small Support Box to properly adhere the 2x4 into proper
position.
4.
Insert the small box in the channel. At this point, do not adhere the small support box to anything.
Place the large support box into the channel and over the top of the small box. Place the CleanCut
Convertible into position and compress downward to determine the proper height and placement
for the support box structure.
5.
Once the support of the CleanCut Convertible has been achieved, remove, mark both the left and right
ends of the small box where the large box is compressed while the boxes are in the tub opening
channel. Once properly marked, remove both support boxes and label the markings “Left” and “Right”
to avoid potential confusion. Uncompress the two support boxes from one another and begin the
process to permanently adhere the boxes in proper position.
6.
Apply adhesive around the perimeter of the large box. Compress the
small and large support box
structures back together to the appropriate markings made earlier on the small box. Place the support
structure back into the channel and insert the CleanCut Convertible to verify that proper placement has
been achieved. Secure both sides of the support structure by placing 2 screws in each side. Make any
final adjustments to the CleanCut Convertible or the support structure at this time (FIGURE 8).
7.
Apply adhesive to the tops of the 2x4’s that are already in place in the channel if they are needed for
height, and insert the support box structure.
8.
Place the CleanCut Convertible into position once more to inspect the fit and position. This is the
final opportunity to make any adjustments, if necessary.
9.
Once the support structure is properly positioned, apply the waterproof membrane over the entire cut out
portion of the tub. First, unfold the membrane that was included in the installation kit. It will be
necessary to cover the entire area of the tub cutout, including the two sidewalls. Remove the paper
backing and stretch the membrane material to cover the area over the support boxes and sidewalls and
adhere approx. ½” onto each side of the tub. It will be necessary to trim excess membrane material.
Small Box
FIGURE 7
Drywall Screws Holding 2x4 (each side)
FIGURE 8
1 ¼” Drywall Screws