Specifications
Installer's Manual: Clean Burn Air Compressors
3-1
SECTION 3: INSTALLING THE AIR COMPRESSOR
IMPORTANT! If you are installing your furnace/boiler and air compressor at the same time, Clean
Burn recommends the following sequence of activities:
1. Assembly of Furnace/Boiler (for furnace - through the installation of mounting/stabilizer brackets).
2. Installation of Air Compressor on Furnace/Boiler
3. Installation of Furnace/Boiler (including oil pump, wiring, oil/air lines, stack, thermostat)
Keep the Furnace/Boiler Operator's Manual handy for quick reference as specified throughout the installation of
the air compressor.
WARNING: If you have already installed your furnace/boiler and power has been connected
to the unit, ensure that the power is turned OFF before proceeding with the installation of the air
compressor to avoid electrical shock hazards.










