When operang normally, with the fan running, the air
cleaner should have both the orange power switch
light and the green performance indicator light ON. If the
fan is running and the lights are not on, see the Trouble-
shoong Guide for probable causes and remedies.
i
CAUTION!
For most troubleshoong, the cells should be removed
from the air cleaner. A short in one of the cells will cause
the power board to shut down and the performance light
will stay o. Unless otherwise directed, remove the cells
from the unit when tesng.
i
WARNING!
Electronic air cleaners use high voltage (low amperage)
power. Only trained personnel should perform service.
Electric shock can cause injury or death.
i
WARNING!
When performing LIVE tests in the power box, NEVER touch
any components inside the air cleaner other than what is
menoned in the tests. Components carry dangerous
voltages and extreme care must be taken.
CHECKOUT – Visual
Visually check the air cleaner installaon to verify that:
• The arrows on the front of the collector cells are
poinng in the direcon of the airow.
• The aluminum mesh prelter is installed on the
upstream side of the air cleaner and the acvated
carbon VOC lters are on the downstream side.
• The handles on the collector cells are facing the front
of the air cleaner cabinet.
• The collector cells and aluminum prelters are clean
and dry.
• All joints in sheet metal between the air cleaner and
the heang and cooling system are sealed.
• Previously-installed furnace lter has been
removed (if present) and blower compartment
has been cleaned.
When you have performed the preceding physical
checkout, proceed to do the operaonal checkout
that follows:
CHECKOUT – Operational
1. Replace any access doors removed during the
Installaon.
2. Toggle the air cleaner power switch to the ON
posion and energize the furnace or air handler
(system) fan.
3. Verify that the orange power switch is ON (lighted).
The orange light shows that there is power supplied
to the air cleaner.
4. Verify that the green performance indicator light
is ON. The green light shows that the high voltage
power supply is working correctly.
5. Turn OFF the system fan. The green light should go
OFF aer a few seconds, but the orange light should
remain ON.
6. For furnaces or air handlers with a mul-speed fan,
air cleaner operaon should be veried by repeang
steps 3 through 5 for each fan speed.
7. For any issues related to air cleaner performance,
refer to Troubleshoong and Service secons in this
manual.