Manual
FoamLogix, Model 2.1A and 1.7AHP Class “A”
Electronic Foam Proportioning Systems
51
INSTALLATION AND DELIVERY CHECK LIST
After the Hale FoamLogix system is installed, use the following check list to verify installation and ensure proper
system setup when the apparatus is delivered to the end user.
INSTALLATION
DATE INITIALS
_______ ________
❑ System properly installed. (Review “Start-Up Check List” on page 48.)
______ _______
❑ Tank level sensor function veried. (Review “System Installer Start-Up” on page 49.)
_______ ________ ❑ Foam pump operation checked. (Review “System Installer Start-Up” on page 49.)
_______ ________ ❑ Foam tank and hoses drained of water. (Review “System Installer Start-Up” on page 49.)
_______ ________ ❑ Flow sensor function checked and calibrated. (Review “User Calibration” on page 53.)
DELIVERY
DATE INITIALS
_______ ________ ❑ Foam tank lled with user specied foam concentrate. (Compies with Hale approved
concentrate compabibility list.)
_______ _______ ❑ Foam pump priming checked.
_______ _______
❑ Flow sensor calibration veried with Pitot.
_______ ________ ❑ Default simulated ow value set to end user specication.
_______ _______
❑ Default foam concentrate injection rate set to end user specication.
_______ _______
❑ Foam concentrate feedback value veried and calibrated with end user specied foam.
_______ ________ ❑ Proper Hale FoamLogix system operation demonstrated to end user in accordance
with manual procedures.
DATE INITIALS
______ ______
❑ End user trained in proper operation of Hale FoamLogix system in accordance
with manual procedures.
______ ______ ❑ Warranty registration card lled out by end user and mailed to Hale Products.
______ ______ ❑ Two copies of Description, Installation and Operation manual provided to end user.