INSTALLATION AND DELIVERY CHECK LIST
After the Hale FoamLogix system is installed, use the following check list to verify installation and ensure proper
system setup when the apparatus is delivered to the end user.
INSTALLATION
DATE INITIALS
_______ ________
System properly installed. (Review “Start-Up Check List” on page 48.)
______ _______
Tank level sensor function veried. (Review “System Installer Start-Up” on page 49.)
_______ ________ Foam pump operation checked. (Review “System Installer Start-Up” on page 49.)
_______ ________ Foam tank and hoses drained of water. (Review “System Installer Start-Up” on page 49.)
_______ ________ Flow sensor function checked and calibrated. (Review “User Calibration” on page 53.)
DELIVERY
DATE INITIALS
_______ ________ Foam tank lled with user specied foam concentrate. (Compies with Hale approved
concentrate compabibility list.)
_______ _______ Foam pump priming checked.
_______ _______
Flow sensor calibration veried with Pitot.
_______ ________ Default simulated ow value set to end user specication.
_______ _______
Default foam concentrate injection rate set to end user specication.
_______ _______
Foam concentrate feedback value veried and calibrated with end user specied foam.
_______ ________ Proper Hale FoamLogix system operation demonstrated to end user in accordance
with manual procedures.
DATE INITIALS
______ ______
End user trained in proper operation of Hale FoamLogix system in accordance
with manual procedures.
______ ______ Warranty registration card lled out by end user and mailed to Hale Products.
______ ______ Two copies of Description, Installation and Operation manual provided to end user.