Owner's manual

THE CONTINUOUS POWER COMPANY
23
N
C
N
O
C
DC INBATT TEST
POINTS
+
C
N
C
N
O
N
O
N
O
C
N
C
C
N
C
C
N
O
N
C
N
O
CC
N
C
DC INPUT BREAKER
N
C
N
O
C
N
O
AC IN/OUT
N
C
GND
_
AC INPUT BREAKER
15A/250VAC
OUTPUT
OUTPUT
3.4 Operating Configuration and Setup:
Figure 3 shows how the UPS System is connected to the traffic cabinet. This schematic
diagram illustrates the interconnections.
Figure 4: UPS TO CABINET INTERCONNECTIONS