Installation Sheet

INSTALLATION PLANNING AND PREPARATION
1. NEVER LIFT THE TUB BY THE PLUMBING. Doing so can result in leaks.
2. Check if the oor is level and of good quality. An uneven oor may impede proper installation of the product. The Floor
structure must be capable of supporting at least 100 pounds per square foot.
a. Clean the area of any debris or trash.
b. Use a 5 or 6 foot level and determine if the oor is level. If it is not, calculate how much mortar you have to use to level
the tub.
c. Insure that you place the drain rough at the proper location.
d. Check if the installer placed the proper electrical service near the pump location. See lectrical requirements for
specications.
3. If this is a deck installation, measure from the oor to the bottom of the rim to ensure that the tub is not suspended by
its rim.
You should always have the entire tub oor fully supported.
HEIGHT TO LIP
SETTING COMPOUND
Illustration E
Illustration G
HEIGHT
TO LIP
TILE
SILICONE
1” X 4” JOIST
STUD
WALL BOARD
AIR GAP 1/4” OR MORE
Illustration F
Illustration D
A
C
L
L
B
B
L
W
A
W
W