User`s guide
WN-5220-S VideoWall User’s Guide
21
Initial Setup
After the displays are installed, follow these steps for
each
display
unit:
Step 1 - Power-Up
Step 2 - Adjust the Input Signal Settings
Step 3 - Adjust the Colors
Step 4 - Save the Settings
Step 1 – Power-Up
CAUTION
100 Volt Users –
Set the red voltage switch at the power
plug
on the power supply to 115V.
CAUTION
115
Volt Users -
Set the red voltage switch at the power
plug on the power supply to 115V.
CAUTION
230 Volt Users -
Set the red voltage switch at the power
plug on the power supply to 230V.
1. Turn the main power
switch (next to the
power cord) to the ON
(1) position
The STBY LED flashes, indicating the power up cycle has
begun. Wait approximately three minutes until the STBY
LED is on continuously.