Specifications
COMPACT LINE ARRAY SOUND REINFORCEMENT SYSTEM
7
INSTALLATION METHOD 2
INSTALLATION
Multi Clusters Flown Vertically
(maximum 4 Clusters)
INSTALLATION METHOD 3
Cluster stacked with LF at the bottom.
(1) Open the package, and take out 171.227 speakers
an d the accessories.
(2) Mount the four M8 rings to the flying frame.
(3) Demount the two M5 thumb screws at the bottom
of LF, and take out the Back Link A. Disassemble
the U grooves and remount the two M5 small head
screws in the original holes.
(4) Disassemble the flying frame of another LF, mount
this LF to the bottom of the first LF by tightening M5
thumb screws accordingly.
(5) Demount the two M5 thumb screws at the top of
the front side of MF/HF.
(6) Insert the two LF Front Links into the U grooves along the
left & right front edges of MF/HF, make sure the two screw
holes on both sides are aligned, and then tighten the
screws through the holes.
(7) Insert one end of the Back Link A into the U groove
on the back of MF/HF and the other end into the U
g r o o v e o n t h e b o t t o m o f L F, m a ke s u r e th e t w o
screw holes at both ends of the link are aligned with
the corresponding holes in the U grooves, mount
t he two M5 thumb screws, and tighten th e m (see
Figure3). Alignment of the white scale lines on the
Back Link A with the edges of the two U grooves
indicates successful m ounting.
(8) Attach one or more clusters of MF/HF to the
bottom of the installed MF/HF accordingly.
171.227