Service manual

PN 4237242C
3.3-1
INSTALLATION PROCEDURES
INSTRUMENT VERIFICATION
3
3.3 INSTRUMENT VERIFICATION
Startup the Instrument
1. Prime the reagent and sweep-flow lines using the Cycle Reagents key.
2. Perform the Hgb Preamp and the Vacuum Adjustment procedures (Headings 4.29 and
4.30, respectively).
3. Select
3 STARTUP and verify proper backgrounds.
4. Perform the Latex Gain Adjustment procedure (Heading 4.27).
5. Set the AIM “target values” (Heading 4.28).
6. Run controls and verify proper system operation. When preparing for calibration, if the
control results are not within the stated expectations, adjust the calibration factors to the
normal control.
Calibrate the Instrument
Preferably, the trainer performs calibration with the customer as part of customer training. If
you (the installer) are also the trainer, you should perform calibration at this time and include
the customer.
Calibration must follow the procedure outlined in the Calibration section of the Operator’s
Guide.
C