Specifications

BRIGHT-CHEQ Incubator Operation Manual
Etigam BRIGHT-CHEQ Biological Indicator Monitoring System
7
PRINTER SETUP
!
Prior to operating the printer, refer to the warnings and remarks
on pages 1-5 and 22 of the printer manual.
CONNECTING AC POWER
1. Ensure that the power switch on the side of the printer is in the OFF position.
2. Insert the small connector from the printer power pack into the matching receptacle in
the back of the printer.
3. If a plug adapter for your environment was included with the kit, attach the plug adapter
to the printer power pack.
You may have to supply an appropriate plug adapter for your environment if one was
not included with the kit.
4. Plug the printer power pack into an outlet.
LOADING THE PRINTER RIBBON CASSETTE
1. To remove the printer cover, grasp the protrusion at the rear of the cover and lift up.
2. Press down on the ribbon cassette while inserting the ribbon between the printing head
and platen (see Figure 1). The ribbon cassette will click into place.
3. Wind up the ribbon slack by turning the knob on the left side of the cassette in the direction
of the arrow that appears above the knob (see Figure 1).
Figure 1. Loading the Printer Ribbon
To remove the ribbon cassette, remove the printer cover and pull up on the cassette
where indicated by the word PULL.
INSTALLATION