Owner`s manual
Page 46
Basket Alignment for 150 lb. Dryers
INSTRUCTIONS
1. Loosen bolts number one (1) through five (5).
2. Place pin “A” in position shown in figures 1 and 2.
3. Check pins “B” at position shown in figures 1 and 2
for equal clearance.
4. If pin “B” clearance is unequal, adjust at nut #6.
5. When clearance at pin “B” is correct, tighten bolts
#1 in the following order, as viewed from rear of
dryer, top right, bottom left, top left and bottom
right.
6. Tighten bolts #5 until flush against back of dryer.
Tighten lock nut #4 to secure bolt #5 in position.
7. Tighten bolts #2 and #3.
8. Remove pin “A” and check for proper clearance at
points “A” and “B”. If clearance is incorrect, repeat
the above steps.
NOTE
Use short sections of round steel rod for pins or
drill bits may be used in place of round rod.
INSTRUCTIONS FOR
ALIGNING BASKETS
ON 150 LB. DRYERS