Specifications

2-13
Catalyst 6500 Series Switch and Cisco 7600 Series Router Network Analysis Module Installation and Configuration Note
78-16413-01
Chapter 2 Installing the Network Analysis Module
Installing and Removing the NAM
When the NAM initially boots, by default it runs a partial memory test. To perform a full memory test,
enter the hw-module module slot_number reset device:partition mem-test-full command. This
command is specific to Cisco IOS software and is not available in Catalyst operating system software.
A full memory test takes more time to complete than a partial memory test depending on the memory
size.
You also can use the hw-module module slot_number mem-test-full command in a Cisco IOS system.
This example shows how to do a full memory test for module 5:
Router(config)# hw-module module 5 mem-test-full
Catalyst Operating System Software
To verify that the switch acknowledges the new NAM and has brought it online, enter the show module
or show port [mod/port] command.
This example shows the output of the show module command:
Console> (enable) show module
Mod Slot Ports Module-Type Model Sub Status
--- ---- ----- ------------------------- ------------------- --- --------
1 1 2 1000BaseX Supervisor WS-X6K-SUP1A-2GE yes ok
15 1 1 Multilayer Switch Feature WS-F6K-MSFC no ok
3 3 2 Network Analysis Module WS-SVC-NAM-1 no ok
5 5 48 10/100BaseTX Ethernet WS-X6248-RJ-45 no ok
.
Console> (enable)
When the NAM initially boots, by default it runs a partial memory test. For Catalyst operating system
software, you can perform a full memory test when you enter the set boot device bootseq mod#
mem-test-full command. This command is specific to Catalyst operating system software and is not
available in Cisco IOS software. This example shows how to do a full memory test:
Console (enable) set boot device cf:1
4
mem-test-full
Device BOOT variable = cf:1
Memory-test set to FULL
Warning:Device list is not verified but still set in the boot string.
Note When specifying the boot device for the WS-SVC-NAM-1 and the WS-SVC-NAM-2, you must use
hdd:1 for the application image and cf:1 for the maintenance image.
Console> (enable) show boot device 4
Device BOOT variable = cf:1
Memory-test set to FULL
When you next reset the NAM, the full memory test runs. A full memory test takes more time to complete
than a partial memory test.
This example shows how to reset the partial memory test:
Console> (enable) set boot device cf:1 4
Device BOOT variable = cf:1
Memory-test set to PARTIAL
Warning:Device list is not verified but still set in the boot string.
Console> (enable)
Console> (enable) show boot device 4
Device BOOT variable = cf:1
Memory-test set to PARTIAL