Installation guide
19
Cisco Catalyst 6500 Series Application-Oriented Networking Module Installation Note
78-16749-01
Verifying the Installation
Figure 7 Ejector Lever Closure in a Vertical Slot Chassis
e. Tighten the two captive installation screws on the module.
Note Make sure that the ejector levers are fully closed before tightening the captive installation
screws.
Verifying the Installation
When you install the module into the Catalyst 6500 series switch, the module goes through a startup
sequence that requires no intervention. At the successful conclusion of the startup sequence, the green
Status LED will light and remain on. If the Status LED does not show green, or if it shows a different
color, refer to Table 1 on page 8 to determine the modules status.
For software installation and configuration instructions, refer to the AON Installation and Administration
Guide.
Using the CLI
The software interface for the module is the Cisco IOS and the Catalyst operating system command-line
interface accessed through a Telnet connection to the switch or through the switch console interface.
Refer to the Catalyst 6500 Series Switch Cisco IOS Software Configuration Guide and the Catalyst 6500
Series Switch Software Configuration Guide for details.
FAN
STATUS
SELECT
NEXT
24 PORT 100FX
WS-X6224
STATUS
ACTIVE
SUPERVISOR2
WS-X6K-SUP2-2GE
STATUS
SYSTEM
CONSOLE
PW
R MGMT
RESET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA EJECT
PORT 1
PORT 2
Switch Load
100%
1%
SUPERVISOR2
WS-X6K-SUP2-2GE
STATUS
SYSTEM
CONSOLE
PWR MGMT
RESET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch Load
100%
1%
63587
All ejector levers flush
with module faceplate