Installation guide
Hardware Installation Guide for Cisco UCS E-Series Servers
Installing E-Series Servers in Cisco ISR G2 Routers
20
Cisco UCS E-Series Server Modules Hardware Installation Guide
OL-26447-01
Figure 9 Tightening the Slot Divider in a Service Module Slot
Step 5
Proceed with hardware configuration tasks.
Removing Slot Dividers
Slot dividers are removed to permit use of double-wide E-Series Servers in modular router slots.
To remove slot dividers from module slots, perform the following steps:
Step 1 Remove any installed service modules, blank faceplates, and slot adapters from the router slot you plan
to use.
Step 2 Loosen the retention screw on the front of the slot divider.
Step 3 Pull the slot divider straight out of the module slot.
Step 4 Proceed with hardware configuration tasks.
Installing the E-Series Servers
Note For Cisco 3900 ISR G2—If you are using PoE, and you want to install one double-wide E-Series Server
and any number of server modules in a a Cisco 3900 ISR G2, you must use a second AC and PoE supply
to support this configuration.
For example, you have a Cisco 3900 ISR G2 that has a PoE capable switch providing power to phones,
and you want to install a double-wide E-Series Server in one slot and one or two single-wide servers in
the other slots, then you must use a second AC and PoE supply to support this configuration.
E-Series Servers can be installed either before or after mounting the router, whichever is more
convenient. To install a E-Series Server, follow these steps:
Step 1 Turn off electrical power to the router. Leave the power cable plugged in to channel ESD voltages to
ground.