Specifications
Send document comments to ucs-docfeedback@cisco.com
3-12
Cisco UCS C200 Server Installation and Service Guide
OL-20732-02
Chapter 3 Maintaining the Server
Installing or Replacing Components
Figure 3-5 Removing and Replacing Hard Drives
Installing Power Supplies
The qualified and supported part numbers for this component are subject to change over time. For the most
up-to-date list of replaceable components, see the following URL and navigate to the page for your server
model and generation:
http://www.cisco.com/en/US/prod/ps10265/ps10493/c-series_part_numbers.html
To replace or install a power supply, follow these steps:
Note If you have ordered a server with power supply redundancy (at least two power supplies), you do not
have to power off the server to replace a power supply because they are hot pluggable.
Step 1 Remove a power supply or a blanking panel from an empty bay:
a. Do one of the following actions:
–
If your server has only one power supply, shut down and power off the server as described in
the
“Shutting Down and Powering Off the Server” section on page 3-6.
–
If your server has two power supplies, the power supplies are hot pluggable so you do not have
to shut down the server.
b. Remove the power cord from the power supply that you are replacing.
c. Push the release lever toward the center of the power supply or blanking panel and pull on the handle
to disengage the supply from the backplane (see
Figure 3-6).
1 Release button 2 Ejector lever
3 Hard drive sled, bottom view 4 Securing screws (four)
3
4
195725
Console
Reset
PSU
MEM
CPU
2
1