Specifications
Send document comments to ucs-docfeedback@cisco.com
2-5
Cisco UCS C200 Server Installation and Service Guide
OL-20732-02
Chapter 2 Installing the Server
Installing the Server Into a Rack
b. Compress the length-adjustment bracket until the mounting pegs (item 6) and locking clips (item 5)
on the slide-rail assembly engage the desired rack holes on the front and rear rack posts.
c. Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
and lock in place.
Figure 2-2 Attaching a Slide-Rail Assembly
d. Attach the second slide-rail assembly to the opposite side of the rack. Ensure that the two slide-rail
assemblies are level and at the same height with each other.
e. Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
and lock in place.
Tip You can optionally use the #2 Phillips screws that come with the slide rails to increase stability after
installation. These screws can be installed on the front attachment bracket on each assembly, but are not
required.
Step 2 Attach mounting brackets to the server:
a. Set a mounting bracket (item 3) on the side of the server, aligning its keyed holes over the pegs on
the server (item 2). The plastic installation release clip (item 5) on the bracket should be toward the
server front. See
Figure 2-3.
b. Push the mounting bracket toward the server rear until the locking clip clicks over the server peg.
c. Attach the remaining mounting bracket to the opposite side of the server.
Tip You can optionally use the #1 Phillips screws that come with the slide rails to increase stability after
installation. You can install two of these screws on each side of the server to more permanently attach
the mounting brackets to each side of the server, but they are not required.
1 Front-left rack post 2 Rear-left rack post
3 Slide-rail assembly 4 Length-adjustment bracket
5 Locking clip (one on each end of assembly) 6 Mounting pegs (two on each end of assembly)
1
3 5
2
64
195968