Troubleshooting guide

22
Cisco UCS B200 M3 Blade Server Installation and Service Note
OL-26624-01
Working Inside the Blade Server
Figure 13 Proper Alignment of CPU Pick and Place Tool (for Intel Xeon E5-2600 Series
Processors)
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
The CPU is supported for that given server model. This may be verified via the server's Technical
Specifications ordering guides (see Installing Memory, page 27) or by the relevant release of the
Cisco UCS Capability Catalog.
A BIOS update is available and installed that supports the CPU and the given server configuration.
If the server will be managed by Cisco UCS Manager, the service profile for this server in UCS
Manager will recognize and allow the new CPU.
If you are installing a CPU in a socket that had been shipped empty, there will be a protective cap
intended to prevent bent or touched contact pins. The pick and pull cap tool provided (See Figure 14)
can be used in a manner similar to a pair of tweezers. Grasp the protective cap and pivot as shown.
1 Alignment mark on the button/handle of the
pick and place tool
2 Alignment mark on the socket
331370
1
2