Specifications

5-248
Cisco ATM Services (AXSM) Configuration Guide and Command Reference for MGX Switches
Release 5.2, Part Number OL-6484-01 Rev. C0, September 2005
Chapter 5
dspchantests
Example
Run tstdelay on connection 1 10 100 then display the results.
Step 1 Execute tstdelay.
MGX8850.1.AXSM.a > tstdelay 1 10 100
Test started; Use dspcon/dspchantests to see test results
Step 2 Check the results.
MGX8850.1.AXSM.a > dspchantests 1 10 100
Connection Id Test Type Direction Result Round Trip Delay
============= ========= ========= ======= ================
01.0010.00100: OAM Lpbk ingress Success 40000
Run tstconseg for 1 10 100 then display the results.
Step 1 Run the test for 1 10 100.
MGX8850.1.AXSM.a > tstconseg 1 10 100
Test started; Use dspcon/dspchantests to see test results
Step 2 Check the results.
MGX8850.1.AXSM.a > dspchantests 1 10 100
Connection Id Test Type Direction Result Round Trip Delay
============= ========= ========= ======= ================
01.0010.00100: OAM Lpbk egress TimeOut 0