Specifications

9-43
Cisco MGX 8800/8900 Series Software Configuration Guide
Release 5.1, Part Number OL-6482-01, Rev. A0, January 25, 2005
Chapter 9 Switch Operating Procedures
Displaying SVCs
Displaying SVCs
To display active SVCs, use the following procedure.
Step 1 Establish a CLI management session at any user access level.
Step 2 Enter the following command:
mgx8830a.1.PXM.a > dsppncons
The following is an example report for the dsppncons command.
mgx8830a.1.PXM.a > dsppncons
Port VPI VCI CallRef:Flag X-Port VPI VCI CallRef:Flag Type OAM-Type Pri
9:1.1:1 0 32 1: 0 9:1.2:2 0 36 5: 0 PTP No 3
Calling-Addr:47.666666666666666666666666.666666666666.00
Called-Addr: 47.111111111111111111111111.111111111111.64
9:1.2:2 0 36 5 9:1.1:1 0 32 1: 0 PTP No 3
Calling-Addr:47.666666666666666666666666.666666666666.00
Called-Addr: 47.111111111111111111111111.111111111111.64
Managing Controllers
Cisco MGX switches support one PNNI controller, and MGX 8850 (PXM45)and MGX 8950 switches
support up to two Label Switch Controllers. The controller identifies a network control protocol to the
Virtual Switch Interface (VSI) that runs on the node.
Adding Controllers
To add a controller, use the following procedure.
Step 1 Establish a configuration session at any user access level.
Step 2 Enter the addcontroller command to add a controller to the node.
mgx8830a.1.PXM.a > addcontroller <cntrlrId> i <cntrlrType> <lslot> [cntrlrName]
Table 9-22 describes the parameters for this command.