Troubleshooting guide

CHAPTER
2-1
Cisco PGW 2200 Softswitch Release 9.8 Operations, Maintenance, and Troubleshooting Guide
OL-0800-14
2
Cisco PGW 2200 Softswitch Platform Component
Startup and Shutdown Procedures
Revised: March 7, 2011, OL-0800-14
This chapter describes how to start and shut down the individual components of the Cisco PGW 2200
Softswitch platform.
The startup procedures for each component of the Cisco PGW 2200 Softswitch platform are included in
the following sections:
Cisco PGW 2200 Softswitch Startup Procedures, page 2-2
Cisco SS7 Interface Startup Procedure, page 2-3
Cisco Switch Startup Procedure, page 2-4
You might need to perform one of these startup procedures after completing one of the following
operations:
Changing the system configuration
Upgrading the software
Testing the system
Troubleshooting alarms
Resolving a problem
Note While considering these procedures, it is assumed that the component is correctly installed, configured,
and provisioned according to the instructions provided in the relevant documentation.
The shutdown procedure for each component of the Cisco PGW 2200 Softswitch platform is included in
the following sections:
Cisco PGW 2200 Softswitch Shutdown Procedure, page 2-4
Cisco SS7 Interface Shutdown Procedure, page 2-5
Cisco Switch Shutdown Procedure, page 2-6