Datasheet

28
OL-17436-01
Checking the Installation
Step 4 During the line card boot process, which occurs immediately after the PRP boots, observe the
alphanumeric display LEDs on each line card.
The system attempts to boot identical line cards in parallel. Furthermore, the system boots line cards as
soon as they are powered on and become available for a system boot. The physical location of the
alphanumeric display LEDs on the line cards is the same as on the PRP, which is shown in Figure 8.
See the appropriate line card installation and configuration note for complete details on line card display
LED sequences.
You must meet the following criteria to successfully boot the PRP:
Flash disk is installed in Flash disk slot 0
Flash disk contains a valid Cisco IOS software image
Software configuration register is set to 0x2102
The system automatically boots this Cisco IOS software image. The system then enters the setup facility,
where you are prompted to perform a basic configuration of the system.
Otherwise, the system enters the ROM monitor and the appropriate prompt appears (
Rommon>).
RUN/MBI Displays “Copyright (c) 2008 by Cisco Systems, Inc.
Install (Node Preparation): Install device root is /disk0/
Install (Node Preparation): Using boot device sequence compactflash: from
rommon
Install (Node Preparation): Trying device disk0:
Install (Node Preparation): Checking size of device disk0:
Install (Node Preparation): OK
Install (Node Preparation): Checking free space on disk0:
Install (Node Preparation): OK
Install (Node Preparation): Starting package and meta-data sync
Install (Node Preparation): Cleaning packages not in sync list
Install (Node Preparation): Complete
Install (Node Preparation): Syncing package/meta-data contents:
/disk0/instdb/ldpath
Install (Node Preparation): Please Wait...
Install (Node Preparation): Completed syncing: /disk0/instdb/ldpath
Install (Node Preparation): Syncing package/meta-data
contents: /disk0/instdb/ldpath.committed
Install (Node Preparation): Please Wait...
Install (Node Preparation): Completed syncing:
/disk0/instdb/ldpath.committed
Install (Node Preparation): Completed sync of all packages and meta-data.
RP/STBY ios con0/2/CPU0 is in standby
LED Display Description or Console Message