Installation guide
1-5
Cisco IGX 8400 Series Installation Guide, Release 9.3.3 and Later Releases
OL-1165-06
Chapter 1 Cisco IGX 8400 Series Product Overview
Where to Go Next
For descriptions of the hardware in an IGX 8410, IGX 8420, or IGX 8430 node, refer to the
Cisco IGX 8400 Series Provisioning Guide.
An IGX series switch is installed with the following steps:
1. Enclosure or rack installation
This includes procedures for installing all switches in the IGX series in a cabinet or rack, using
appropriate tools and mounting rails.
2. AC or DC power supply installation
Procedures for mounting the AC or DC power supplies, installing redundant power supplies, and
connecting to the power-entry back cards.
3. Cooling unit installation
Installing cooling fans in the IGX enclosure.
4. Power and ground connections
Connecting the IGX to power and ground.
5. Card installation
Procedures for installing the various front and back cards available for the IGX node.
6. Node startup
Starting the node for the first time.
For more information on the procedures necessary to complete these steps, see Chapter 2, “Power
Worksheets.”
Where to Go Next
For information on preparing to install an IGX, see Chapter 2, “Power Worksheets.”
For software configuration and service provisioning information, see the Cisco IGX 8400 Series
Provisioning Guide, Chapter 1, “Introduction to the Cisco IGX 8400 Series.”
For more information on switch software commands, refer to the Cisco WAN Switching Command
Reference, Chapter 1, “Command Line Fundamentals.”