Operating instructions
© Copyright IBM Corp. 2004, 2005. All rights reserved. 79
Chapter 6. IBM eServer BladeCenter system
initial setup
This chapter discusses the network topology and the hardware configured to provide you with
a tested and working configuration to help implement your Cisco Systems Intelligent Gigabit
Ethernet Switch Module (IGESM) for the IBM Eserver BladeCenter.
As noted elsewhere in this document, the information herein applies to the 4-port
copper-based IGESM running a 12.1(14) version of IOS. If working with the 4-port SFP-based
IGESM or a 4-port copper-based IGESM running 12.1(22) and above code, see the
appropriate document for those solutions.
6