Operating instructions
134 Cisco Systems Intelligent Gigabit Ethernet Switch Module
Step 5: Reconnecting the devices
This is the final step to bring the connection into full operation. This will be the reverse of
whatever procedure was used in step 1. See Table 7-2 on page 123 for details about how to
reestablish the links.
Step 6: Verifying the configuration
This section provides options for verifying the correct and desired operation.
Verifying correct operation on the blade servers
Review the BASP application for the desired configuration of teaming and VLANs on
BladeServer1 (see Figure 7-4). BladeServer2 should not have a BASP configuration for this
example (see Figure 7-5).
Figure 7-4 BladeServer1 BASP configuration
Figure 7-5 BladeServer2 BASP configuration (BASP not used on BladeServer2)
Using Windows 2000 networking tools, review the logical and physical network. Figure 7-6
and Figure 7-7 show BladeServer1 and BladeServer2.