Specifications

Installation and Start-up 7-23
Cable Management
Figure7-16 Cable Management Kit on the Plenum Chamber
Main Cooling and Booster Cooling Kit
The cable management kit that is installed on the cooling module and booster cooling module,
consists of a set of brackets, a power routing assembly, and the cable management panel as shown
in Table7-2.
Table7-2 Cooling and Booster Kit Bill of Materials
A cable management kit for the cooling and booster units is shown in Figure7-17. Referring to this
figure, install the kit as follows:
Step 1 Install the two short fan panel brackets onto the sides of the cooling unit, one on each side
using two thread forming screws for each bracket. If a rear rail is being used to mount the
plenum, use the protruding flange to attach to the rail using two thread forming screws and
washers (supplied with the cooling unit install kit). If there is limited access, use the
procedures described under Limited Access. Install the power and fan cable management
assembly onto the two short fan panel brackets using two screws with locking nuts for each
bracket.
Description Quantity
Number 10 flat washer 12
10-32, 0.375 in. long screws with locking nuts 8
10-32, 0.375 in. long thread forming screws 8
Cable support 2
Power and fan cable management assembly 2
Short fan panel bracket 2
Cable management panel 1