Specifications
Index
IN-8
Cisco ONS 15454 Installation and Operations Guide, R3.2
March 2002
G1000-4 9-1
circuits
hub-and-spoke
9-22
manual cross-connects 9-25, 9-34
multicard and single-card EtherSwitch
point-to-point
9-15, 9-31
protection 9-14
shared packed ring circuit 9-18
collision monitoring (RMON) 9-50
EtherSwitch 9-12 to 9-14
fiber interface 1-50
flow control 9-3
frame buffering 9-3
Gigabit EtherChannel 9-4
history screen 9-46, 9-48
jumbo frames 9-1
line utilization screen 9-45, 9-48
link integrity 9-4
MAC address screen 9-49
port provisioning
E series
9-7, 9-10
G1000-4 9-7
port-provisioning
VLAN membership
9-10
priority queuing 9-37
router aggregation 9-1
spanning tree protection 9-40
statistics screen 9-43, 9-47
threshold variables (MIBs) 9-50
trunk utilization screen 9-49
VLANs 9-36
EtherSwitch
multicard
9-12
ONS 15327 circuit combinations 9-14
single-card 9-13
events 10-3, 10-7
examples
adding a BLSR node
5-18
BLSR bandwidth reuse 5-8
converting degrees to degrees and minutes 3-2
creating a VT1.5 circuit on an EC-1 card 6-17
creating login node groups 2-11
creating VT1.5 circuits 6-16
DCC tunnel 6-21
moving a BLSR trunk card 5-25
network timing 3-12
PPMN 5-51
removing a BLSR node 5-22, 5-24
subtending BLSRs 5-40
two-fiber BLSR 5-9
UPSR 5-29
virtual wires 7-26
VT tunnel 6-19
external (environmental) alarms 7-27
external controls 7-28
external timing 3-12
F
failure count, provisioning 7-21
fan-tray air filter see air filter
fan-tray assembly
description
1-24
fan failure 1-25
fan speed 1-25
installing 1-26
FC-L parameter
EC-1 card
8-16
OC-12, OC-48, OC-192 cards 8-42, 8-45, 8-47, 8-50
OC-3 card 8-18, 8-37, 8-40
ferrites
attaching to power cables
1-61
attaching to wire-wrap pin fields 1-63
fiber boot 1-53
fiber-optic cables
installation on GBIC (Ethernet cards)
1-50
installation on OC-N cards 1-53
routing 1-55, 1-56