Specifications
9-33
Cisco ONS 15454 Installation and Operations Guide, R3.2
March 2002
Chapter 9 Ethernet Operation
G1000-4 Circuit Configurations
Figure 9-26 Circuit Creation dialog box
Step 7
Choose the circuit source node from the Node menu. Either end node can be the circuit source.
Step 8 From the Slot menu choose the slot containing the G1000-4 card that you will use for one end of the
point-to-point circuit.
Step 9 From the Port menu choose a port.
Step 10 Click Next.
The Circuit Creation (Destination) dialog box opens.
Step 11 Choose the circuit destination from the Node menu.
Step 12 From the Slot menu choose the slot that holds the G1000-4 card that you will use for the other end of
the point-to-point circuit.
Step 13 From the Port menu choose a port.
Step 14 Click Next.
The Circuit Creation (Circuit Routing Preferences) dialog box opens.
Step 15 Confirm that the following information about the point-to-point circuit is correct:
• Circuit name
• Circuit type
• Circuit size
• ONS 15454 nodes included in the circuit
Step 16 Click Finish.
Step 17 If you have not already provisioned the Ethernet card, follow the “Provision G1000-4 Ethernet Ports”
procedure on page 9-7.
Note To change the capacity of a G1000-4 point-to-point circuit, you must delete the original circuit and
reprovision a new larger circuit.